CymitQuimica logo

CAS 88180-17-0

:

9H-Fluorene, 1,2,3,4,5,7,8-heptachloro-6-methyl-9-(pentachlorophenyl)-

Description:
9H-Fluorene, 1,2,3,4,5,7,8-heptachloro-6-methyl-9-(pentachlorophenyl)-, with CAS number 88180-17-0, is a complex chlorinated organic compound. It features a fluorene backbone, which is a polycyclic aromatic hydrocarbon, modified by the presence of multiple chlorine atoms and a methyl group. The extensive chlorination contributes to its hydrophobic nature and potential persistence in the environment. This compound is likely to exhibit low volatility and high stability, making it resistant to degradation. Its structure suggests potential applications in various fields, including materials science and possibly as a chemical intermediate. However, the presence of multiple chlorine atoms raises concerns regarding its environmental impact and toxicity, as chlorinated compounds can be bioaccumulative and may pose risks to human health and ecosystems. Safety measures should be taken when handling this substance, and its use may be subject to regulatory scrutiny due to its chemical properties and potential environmental effects.
Formula:C20H4Cl12
InChI:InChI=1S/C20H4Cl12/c1-2-9(21)6-4(11(23)10(2)22)3(5-7(6)13(25)17(29)16(28)12(5)24)8-14(26)18(30)20(32)19(31)15(8)27/h3H,1H3
InChI key:ZQICMTIVPWKBMQ-UHFFFAOYSA-N
SMILES:CC1=C(C2=C(C(C3=C2C(=C(C(=C3Cl)Cl)Cl)Cl)C4=C(C(=C(C(=C4Cl)Cl)Cl)Cl)Cl)C(=C1Cl)Cl)Cl
Found 0 products.